Skip to content
TOWARDS SUSTAINABILITY
Careers
Latest News
Contact us
Careers
Latest News
Contact us
Off-plot (Mech, CE and EEE)
On-Plot Works:
Fabrication, testing, painting, and installation of pipe supports, steel structures, and piping systems.
Installation of insulation where required.
Erection and installation of company items.
PE fusion, pulling, and installation.
Roto-lining for specified components.
Hydro, pneumatic, and leak testing.
Non-destructive testing (NDT) such as RT, UT, MT, PT.
Dismantling, cleaning, flushing, draining, and drying systems.
Off-Plot Works:
Pipe stringing and installation of sleepers.
Welding of flow lines, trunk lines, and water injection lines.
PE fusion, pulling, and installation.
Cold bending and roto-lining for well hook-ups.
Fabrication, testing, painting, and installation of well hook-ups.
NDT and hydro-testing.
Dismantling, cleaning, pigging, flushing, draining, and drying.
Cathodic protection where required.
Manifold Installation (Nos)
0
+
On Plot Welding (ID)
0
+
Hook Up Installation (Nos)
0
+
4" Flowline Construction including PE lining (Km)
0
+