Off-plot (Mech, CE and EEE)

On-Plot Works:

  • Fabrication, testing, painting, and installation of pipe supports, steel structures, and piping systems.
  • Installation of insulation where required.
  • Erection and installation of company items.
  • PE fusion, pulling, and installation.
  • Roto-lining for specified components.
  • Hydro, pneumatic, and leak testing.
  • Non-destructive testing (NDT) such as RT, UT, MT, PT.
  • Dismantling, cleaning, flushing, draining, and drying systems.

Off-Plot Works:

  • Pipe stringing and installation of sleepers.
  • Welding of flow lines, trunk lines, and water injection lines.
  • PE fusion, pulling, and installation.
  • Cold bending and roto-lining for well hook-ups.
  • Fabrication, testing, painting, and installation of well hook-ups.
  • NDT and hydro-testing.
  • Dismantling, cleaning, pigging, flushing, draining, and drying.
  • Cathodic protection where required.
Manifold Installation (Nos)
0 +
On Plot Welding (ID)
0 +
Hook Up Installation (Nos)
0 +
4" Flowline Construction including PE lining (Km)
0 +